Who it suits
Roofs at the end of their service life, roofs with widespread storm damage, and any roof where repairs have stopped holding.
Full tear-off to the deck, inspection and repair of the wood underneath, then a complete new roof: underlayment, flashing, pipe boots, shingles and ventilation.

A proper roof replacement in North Alabama removes everything down to the deck, replaces any soft wood, then installs new underlayment, edge metal, flashing, pipe boots, shingles and ridge ventilation. Most homes take one to three days. The ACM Pros never quote layovers, and we show you photos of any rotted decking before we price it.
The details
Roofs at the end of their service life, roofs with widespread storm damage, and any roof where repairs have stopped holding.
We do not quote layovers. Putting new shingles over the old layer hides the deck, and you cannot inspect what you cannot see. The new roof inherits every defect underneath it, and the whole roof ages faster.
If a competing quote is much cheaper, check whether it is a layover before assuming you found a bargain.
Each step in this sequence is a place where a fast job saves an hour and the roof pays for it later.
Attic heat in North Alabama is extreme, and it cooks shingles from underneath. Ridge exhaust matched to enough soffit intake is not an upgrade. It decides whether the roof reaches its rated life.
Exhaust without intake does very little, and mixing exhaust types can short-circuit the airflow entirely. We check the intake before we choose the exhaust.
Replacement is the right answer when granule loss or cracked shingle mats are widespread across several slopes. It is the wrong answer for wind damage in one spot or a single failed pipe boot. In those cases we quote the repair, even though the replacement invoice would be larger.
We protect your driveway and landscaping first, then start tear-off early so the deck is open in daylight. You see photos of any soft decking before we price it. Magnetic sweeps for nails run each evening and again at the finish.
We price after measuring, line by line, with the materials named. These are the things that move the number.
We walk your exterior, measure, and show you the options. There is no charge and no pressure.
You get a written scope with every line and material named. Then we order for your home.
Cut, fitted, trimmed, cleaned up and hauled away the same day. You never look at a pile of old frames.
Everything comes off, down to the roof boards, so the deck can be checked and repaired before the new roof goes on. Layering new shingles over old hides whatever is underneath and shortens the life of both.
Most single-family roofs take one to three days, depending on size, pitch and access. Weather sets the schedule more than the work does, and we never open more roof than we can dry in the same day.
Sometimes, and it is the main variable in the final number. We quote a rate per sheet up front so it is not a surprise, and we photograph anything we replace.
A square is 100 square feet of roof surface, not floor area. Pitch matters because a steeper roof has more surface than its footprint suggests, and it is slower and less safe to work on.
Yes. The rubber dries and cracks with age, and a failed boot is the most common leak we are called out to. Replacing them costs almost nothing during a tear-off.
We watch the forecast and only open as much roof as we can dry in, meaning sealed with underlayment, the same day. If weather moves in, the roof is properly dried in rather than tarped.
They are tested to a higher impact rating and they cost more. Whether they pay back depends on how exposed your home is and on your insurance. We will price both so you can decide.
Probably. Many Huntsville and Madison roofs were replaced after the April 2011 storms and are now about fifteen years old, which is when wear starts to show in this heat. A check is worth it even if the roof looks fine from the ground.

Full tear-off roof replacement and balanced attic ventilation, built for North Alabama hail, wind and attic heat.
Learn more
Balanced attic ventilation, ridge exhaust matched to soffit intake, so attic heat does not cook your shingles from underneath.
Learn more
Rotted soffit and fascia repaired and replaced, with vented soffit checked so your attic breathes and your roof lasts.
Learn more
Low-pressure soft washing for shingle roofs that removes black streaks, moss and lichen without stripping granules.
Learn more
House, roof, driveway, deck and commercial washing, with soft washing for roofs and siding and real pressure only on concrete.
Learn more
Roofing9 minute read
Squares, decking, flashing, ventilation and access: what really moves the price of a new roof in North Alabama, and why the cheapest quote often skipped a step.
We're based in Madison and work across North Alabama, providing roof replacement in every area below. We do not work in Tennessee.

Tell us what you're picturing. We'll come out, measure up, and give you a free written estimate, so you know exactly what to expect before any work begins.